Work backwards from the date, not forwards from today
The date the shirts are needed is the only fixed point in this process. Everything else moves. So start there and count back:
- Two weeks minimum for production — ordering the blanks, printing them, packing them.
- About five business days of transit if you are on the East Coast. We print in San Diego.
- One week for you to collect sizes and payment, which always takes longer than anyone promises.
That is four weeks from "I should probably start this" to shirts in hands. Chapters that start three weeks out usually make it. Chapters that start two weeks out are paying a rush fee or explaining themselves at chapter.
Collect sizes before you design anything
This is the step people skip, and it is the one that cannot be fixed later. You can change a design the day before production. You cannot change the fact that eleven people never told you their size.
Use a form, not a group chat. A group chat produces sizes scattered across four hundred messages, three of which say "medium?" with a question mark. A form produces a spreadsheet.
Ask for the size and nothing else. Not the color, not the design preference — those are chapter decisions, and opening them to a vote is how a two-week order becomes a five-week order.
Add spares. Two or three, more if the order is large. Somebody's size will be wrong, somebody will join late, and somebody will spill something on theirs before the event.
Collect the money at the same time as the size
One form, one submission, size and payment together. The moment those become two separate asks, you become a collections agent for the next eleven days.
Know your per-piece cost before you send the form, so the number on it is the real number. That means the garment, plus $5 per piece for the logo, minus the group discount your headcount qualifies for. Group pricing starts at six pieces: 5% off at six, 8% at twelve, 12% at twenty-four. Standard shipping is free over $300, which most chapter orders clear.
Get the design approved once, by the people who can approve it
Design by committee is the second-biggest source of delay after size collection. Decide up front who signs off — usually the merchandise chair plus one officer — and let everyone else react to a finished mockup rather than an open question.
It helps that you can see the design on the actual garment before anyone pays for anything. Describe what you want, the AI draws it in seconds with the background already removed, and you swap the garment color and the ink until it looks right. Every account gets five designs free, which is enough to bring three real options to a vote instead of a description.
Keep the design to two ink colors if you can. At three colors or fewer we screen print, which is what gives Greek apparel that thick, opaque look that survives a hundred washes. Above three the job moves to digital DTF, which handles photographs and gradients but sits lighter on the fabric.
If your chapter's mark is on it, know who carries the liability
Your national organization owns the letters, the crest, and the seal — not your chapter. For internal chapter orders most nationals permit member use, but the permission is narrower than people assume, and it is worth confirming rather than assuming.
Be clear about where your vendor stands, too, and get it in writing. Ours is written down: you assume liability for your artwork and any royalties owed on protected marks, and we do not hold a licence with any national sorority. A vendor who is vague about this is a vendor who has not thought about it.
What actually goes wrong
In rough order of frequency: sizes collected late, money collected later, a design changed after production started, and an order placed for the event date instead of three weeks before it. None of those are printing problems. All of them are calendar problems.
The chapters that get this right treat it as a project with a deadline, not an errand. One form, one design approval, one order, placed early.